7-week fit out which included a shutdown over the Christmas period.  Our first time working in a busy airport departure lounge.  Working closely with the client, design team and the MAG team involved with the refurbishment of the airport.  This was a blank shell without even electrics.

Work Undertaken

  • Deliveries made by driving down the runway out of hours once airport had no planes or customers
  • Work permits for every staff member on site which included for checks
  • Installation of hoarding
  • Floors had to be levelled prior to Karndean flooring being installed throughout
  • Construct new primary grid using Metsec purlin and Unistrut structure that formed support structure for the MF ceiling and cable trays for the power
  • Full electrical installation including lighting, general power, music and PA System
  • Full Sprinkler System
  • Full HVAC System
  • Changing room, stock room and staff areas constructed
  • Security shutters
  • Decorations and fixtures and fittings installed
  • Signage internally and externally